Wednesday, June 1, 2011

Strategic Plan for School Development



STRATETIC PLAN FOR SCHOOL DEVELOPMENT

PRE-SCHOOL VISIT PLANNING



PROPOSED THREE DAYS WORKPLAN FOR SCHOOL DEVELOPMENT PLAN

Activity
With Whom?
Why?
Duration
Resources
DAY ONE (08:30am – 12:30pm = 4 Hrs)
Meeting with the Principal
IED CPs with Principal
For introduction, exchange ideas about the purpose, time negotiation and team orientation.
08:30am – 09:15am
(45 minutes)
Readiness Checklist.
Supporting/Hindering Factors list.
Who, when & why formats.
Round of the school
Anybody.
To learn the existing structure, methods and procedures being used.
09:15am – 10:00am
(45 minutes)
Check list + Field notes
Current Resources Format.
Introductions to teachers
System of administration
Depending on discussion with Principal
To learn the existing structure, methods and procedures being used.
10:00am – 10:30am
(30 minutes)
Field notes.
Team formation
Principal + Vice Principal
To identify stakeholders to include Principal, VP, Finance, coordinator, BOG representative, Two teachers (Senior, Junior), student, and parent (if available).
10:03am – 11:00am
(30 minutes)
Format designed.
Awareness Workshop/talk with Team
All the team members.
To inform all the team members about the purpose.
11:00am – 12:30am
(90 minutes)
Time Machine.
Scenario Planning (basic idea)
Sharing ideas.
Charts and Markers etc.
DAY TWO (08:30am – 12:30pm= 4 Hrs)
Need analysis  & Vision building
All the team members.
To identify the school vision, and to involve every individual in shared vision process
08:30am – 09:30am
(60 minutes)
SDP Manual format and our own tool developed in class.
(Charts and Markers)
Internal/external analysis
All the team members.
For the screening of internal/external situation of school
09:30am – 10:30am
(60 minutes)
SWOC Analysis Format.
Decision on the duration of time
All the Team members.
To formulate a long term plan.
10:30am – 11:00am
(30 minutes)

Setting Targets/ goals
Team divided into areas.

11:00am – 12:30pm
(90 minutes)
SDP Manual
DAY THREE (08:30am – 12:15pm = 3:45 Hrs)
Designing the plan
Activities identification and to be prepared in groups (four groups accompanying one CP in every group)
To prepare a plan in light of identified targets and goals.
08:30am – 10:00am
(90 minutes)
SDP Manual
Charts and Markers.
Monitoring plan
Whole team

10:00am – 10:45am
(45 minutes)
SDP Manual
Sharing with entire staff and Exit
Whole team + all the staff members.
To present the plan so that, every member could feel its ownership.
10:45am – 12:15pm
(90 minutes)
Staff Meetings/discussion

School visit

(Some text about the initial phase of school visit – school’ readiness, and team building process)

School Readiness Checklist


S#
Statement
    Yes/No
remarks
1
Does the school have a long-term vision


2
Is there any existing school plan
    

3
The stakeholders’ input will be available


4
the school data will be ready to be used in decision making process


5
the school is knowledgeable about what other schools are doing to achieve change


6
The school leadership is knowledgeable about current trends in educational reform


7
the school leadership is effectively managing human and fiscal resources


8
The school is not passing through some critical period


9
The permission and commitment from system authority is available


DSP Team Building

  1. Managing Director
  2. Principal
  3. Vice Principal
  4. Accounts Officer
  5. An Experienced Teacher
  6. A Novice Teacher
  7. Montessori Teacher
  8. Female Student
  9. A male student
  10. Four CPs from IED.

VISIONING EXERCISE


(The process of vision building using different tools and specifically mentioning the tools we used and created by ourselves).

School Vision


We, at the London[1] Grammar School, believe in the creativity of the learner. We aim to develop responsible and confident students who are capable of facing the challenges of society.
Our teachers and management strive to be role models who are professionals in approach and devoted to their work through continuous learning. We cherish parents as well informed participants in the learning of the children.

School Motto


Light The Lamp Of Learning

SITUATIONAL ANALYSIS


(Some more text about the process of Situational analysis is required)

PESTE Analysis

(text)

SWOC Analysis

(Text)

Main Points

(Some text then bellow table)


Strength (internal)
Weakness (internal)
  • Students are motivated
  • Autonomy in decision making
  • Existing computers
  • Two vacant rooms
  • Students of grade 1 are active.
  • Cooperation among teachers
  • Management is systematic
  • Good metric result
  • Prevailing spoken English
v  Congested building
v  Untrained teachers
v  Computers are very old
v  Low motivation of teachers
v  Teachers’ turn over
v  Lack of exposure to student
v  No supports and physical activities
v  No lesson plans
v  Limited finance
v  No library
v  No activity based teaching
Opportunities (external)
Challenges (external)
  • Computer centers
  • Computers in 80% students’ homes
  • Functions in other schools
  • Park outside of the school
  • Area Nazim is cooperative
  • AKU-EB.
v  No parents involvement
v  No coordination with other schools
v  Competing fee structure in neighbor
Schools
v  Govt. policies frequently change
v  Affiliated with Sind Board


Strength (internal)
  • Students are motivated
  • Autonomy in decision making
  • Existing computers
  • Two vacant rooms
  • Cooperation among teachers
  • Management is systematic
  • Good metric result
  • Prevailing spoken English

Weakness (internal)
v  Congested building
v  Untrained teachers
v  Computers are very old
v  Teachers’ turn over
v  Lack of exposure to student
v  No support and physical activities
v  No lesson plans
v  Limited finance
v  No library
v  No activity based teaching

Opportunities (external)
  • Computers in 80% students’ homes
  • Functions in other schools
  • Park outside of the school
  • Area Nazim is cooperative
  • AKU-EB.
Challenges (external)
v  No parents involvement
v  No coordination with other schools
v  Competing fee structure in neighbor schools
v  Govt. policies frequently change
v  Affiliated with Sind Board

GOALS AND OBJECTIVES

(Text)

A wish List


(Text)

A WISH LIST


Teachers’ Professional Development.

1.      In-school workshops – monthly
2.      Short courses out of the school – one teacher in the first year and two or three teachers in the next four years.
3.      Introduce Reflections or reflective journals –
4.      Peer Coaching
5.      Mentoring
6.      Lesson Planning

Management.

1.      Section in-charges
2.      Introduction of a Policy document.
3.      Assign an additional responsibility to every teacher.
4.      Installation of soft boards in all corridors to display students’ work.
5.      Increase the number of computers and networking.
6.      Library/recreational hall



Students:

1.      Divide students in 3 houses along with teachers.
2.      Clubs in class 9th (Identified as a model class) – Drama & Art Club, Literary Club & Science Club. One day Kingdom – Outgoing 10th class.
3.      Displays (Resources day)
4.      Research based homework.
5.      Group work in classes.


Community.

1.      Enhance collaboration with other organizations – visit to other schools
2.      Fathers’/Mothers’ Day and sibling days.
3.      Section-wise picnics.
4.      Staff picnic.
5.      Invitation to parents for functions & gatherings.
6.      Sports week. (In a part of stadium)
7.      Celebrating success and recognition with Parents.



GOALS (A wish list)


(Text)

  1. Develop creativity and confidence in students through various activities.
  2. Improve teaching learning practices.
  3. Proper utilization of available resources and space to provide sports and creativity, library etc.
  4. Develop formal school policy and prospectus.
  5. Developing relationships/links with other schools.
  6. Increase parental involvement.
  7. Improve computers and networking.
  8. Distributed leadership development.
  9. Strengthen professional development of teachers.
  10. Enhance creativity, confidence and provide greater opportunity to students to express their creativity.
  11. Improve management effectiveness.
  12. Professional Development of al least 70% teachers in the next 5 years.
  13. Introduce 5 new co-curricular activities to build creativity and confidence among students.
  14. Formalize management structure and policies.
  15. Increase involvement with community.



Priorities Goals and Objectives


A:        Teaching Learning
B:         Professional Development of Teachers.
C:        Management and Infrastructure
D:        Community Involvement

Goals and Objectives for Five years


GOALS
OBJECTIVES
Goal 1:
Improve teaching practices in school for improved learning
1.       Begin creative, formal lesson planning in all subjects next year.
2.       Students to be engaged in giving presentations in class VI-X by 2010
3.       Introduce Activity based and hands on activities for conceptual understanding by 2012.
Goal 2:
Nurture creativity and confidence in students through co-curricular activities.
1.       Develop leadership skills in class X students by forming Science, Literary and Drama Clubs next year on wards to plan activities for school.
2.       Provide opportunity to all students within school to display talent and develop confidence through participation in various activities.
Goal 1:


Professional development of teachers
1.       Develop all teachers through quarterly in-house workshops in 2008-2009.
2.       Initiate peer observations and mentoring in 2010.
3.       Identify training opportunities and send at least 1 teacher x 4 subjects to attend workshops every year outside school from 2010 – 2013.
4.       Develop 1 PDT for the school by sending for professional qualification.
Goal 1:

Increase management effectiveness
1.       Delegate leadership responsibilities to 3 teachers on a rotational basis every year.
2.       Prepare formal policy document for the school by August 2008
3.       Identify courses and send Principal/Vice Principal for training in 2009 and 2010.
Goal 1:
Build links with other school to learn better practices.
1.       To expose selected senior students and club in-charge teachers/section heads to other practices through visits to other educational institutions/schools in the city from the year 2009-2010
Goal 2:
Build links with the neighboring community through various activities.
1.       Identify the opportunities in neighborhood and rent-out school premises and facilities for use in the evening or summer holidays.
2.       Increase interaction of students and teachers with the neighborhood community through melas and awareness campaigns from 2011 on wards.





ACTION PLAN


Goals
Objectives
2009
2010
2011
2012
2013
Enhance teachers professional development

Initiate reflection writing among all teachers
Workshop on reflective practices – improve on current reflective practice




Develop teachers professional / pedagogical skills through workshops and trainings
·                     Utilize in-house capacity to share professional practices through quarterly in house workshops
·                     Section heads to identify training opportunities outside school
Invite experts to deliver workshops.
Send at least 2 teachers to attend work shops outside school and share learning with peers
Invest in at least 1 teacher to take up professional qualification course to develop a PDT for the school


Improve teaching practices
To begin formal creative lesson planning
·    Introduce regular lesson planning for each subject
·    Encourage innovative teaching strategies
·    Develop a resource room for teachers activity based learning/ group work
Improve collaboration among peers through peer coaching class observation and feedback

Develop a resource room for teachers

Provide opportunities to students to demonstrate their skills and talents

Give leadership roles to senior students(X grade) and involve all students in activities to demonstrate their talents through club formation and other activities
Begin taekwondo classes for students from classes 1 to 6
Have an annual sports week

Display students work in corridors and school offices Participate in interschool competitions
Display students work through exhibitions



Increase management effectiveness

Prepare a formal policy document for the school.
Delegation of leadership roles to 3 teachers as section heads and 3 teachers as club incharges with 3 students.
Identify training programs for professional development of members in the management team.
Management team to identify feasibility of letting out building premises/ sports room to generate additional funds.
Principal and vice principal to attend atleast 2 workshops related to management, in a year



Increase parental involvement

Parents to be regularly informed on school activities through circulars
Parents to be invited to all programs of the school.

Initiate parental participation in school activities
Give recognition and appreciation  to parents through celebration of Parents’ day or Parents’ evening


Plan workshops for parents

Form a PTA
Opportunities for exposure to other institutions









Principal to contact and arrange 3  visits in a year, of students and teachers to programs in other schools
1 Teacher from each grade level to incorporate at least 1 field trip in a year in their lesson plan.

Interacting with the neighborhood  through 1 activity in a year          (mela or educational awareness campaigns)


Improve existing facilities in the school

Establish
  • a library
  • a room for indoor games
  • add two new computers to the computer lab by August

Upgrade th e computer lab further





















Goal 1: Improve teaching practices in the school for improved learning.
Objective
Action
Who will Do It?
By When
Resource
Estimated Cost
To begin formal lesson planning and introduce innovative teaching strategies.
* Introduce and follow-up regular lesson planning for each subject
* Monitor the lesson plans and give feedback.
Initial stage:
Vice Principal KG – V
Principal, VI – X
Next Stage:
Respective Section In-charges
1 meeting period every week in each subject.
1 week prior planning submitted every Friday.
20 Files + 150 format (Lesson plan tool)
Make modification in timetable.
Time –
Time for reviewing lesson plan and giving feedback
Files: Rs: 300
Formats: Rs: 300



1 Period for meeting.
2 hrs.

Incorporate one activity for students’ critical thinking or inquiry in each lesson plan.
Each teacher.
Throughout the year.
Stationery, (Charts, Markers, worksheets etc.)
Charts:   Rs: 1000 (for entire year)
Markers: Rs:  500 (all activities)
Others:  Rs: 300
One research based homework in one subject every month.
Subject teacher at every grade level.
English – Aug, Jan
Math – Sep, Feb
Science/S. Studies – Oct, Mar
Urdu/Islamiyat – Nov
Human resource, computer facility at home/other sources (newspaper, books, magazines etc.)
Teachers’ own resources and time.
Classroom observations with feedback.
Principal, vice Principal, Section In-charges
4 observations in a year
Phase I: Aug. Sep.
Phase II: Oct. – Nov.
Phase III: Jan. – Feb.
Phase IV: Mar.– Apr.
Observation Schedule & time.
100 Observation Tool copies.


20 minutes in each class.
Photocopies of observation tool. Rs: 200













Goal 2: Nurture creativity and confidence in students
Objective
Action
Who will Do It?
By When
Resource
Estimated Cost
Provide opportunity to students through out the year to display their creativity by participating in co-curricular activities planned with the help of club in-charges, and sports in-charge.
* Form;
Drama Club
Literary Club
Science Club in class X
* Assign one student and one teacher  In-charge.
1 class Teacher + Er, Ra R. Ra. K.



Principal
August 2008
Human Resource, 1 period allocation,
4 teachers.
1 period.
Drama Club Activity
Club + In-charges
September 2008
Mic system, seating & stage arrangement, 1 period allocation
Rs: 1000
1 period

Science Club Activity
Club + In-charges
January, 2009
Stationery, Other resources depending on activity, teachers’/students’ time.
Rs: 1000
3-4  periods
Literary Club Activity
Club + In-charges
April 2009
Mic System, seating & stage arrangement, 1 period allocation
Rs: 1000
2 periods
One day kingdom.
Ms. Se, Hi.
One day before winter vacation
Human Resources, Planning and ask allocation schedule, 1 day allocation
25 students of class X
2 Teachers
1 school day
Sports Week
All Teachers + Sports Committee
February 2009
Stadium, Sports equipment, transportation (outsourced).
Out sourced through sports teacher
(No monetary cost to school)
* Hire a Tae-Kwando teacher
* Tae-Kwando classes for I – V (girls + Boys) VI – X (boys only)
Principal

Instructor
August 2008

Once every week
Salary

Space (Public Park, 1 Period allocation)
Rs: 10,000

No cost to school












Goal 3: Enhance Professional development of teachers
Objective
Action
Who will Do It?
By When
Resource
Estimated Cost
To expose teachers to new  teaching methodology and reflective practice in next academic year
Quarterly in-school workshops for all teachers on 1st  Saturday: (topics identified)
* Lesson Planning




Ms. Gha.


1st week of Aug. 2008


Classroom/school, charts/markers, refreshment.
Stationery (purchased)
Refreshment: Rs: 500
* Activity based teaching.

Ms. She.
1st week of Nov. 2008
Classroom/school, charts/markers, refreshment.
Stationery (purchased)
Refreshment: Rs: 500
* Teachers Motivation
Madam Ati
1st Week of Feb. 2009
Classroom/school, charts/markers, refreshment.
Stationery (purchased)
Refreshment: Rs: 500
* Reflective Practices.
Ext. Facilitator
1st Week of April/May 2008
Classroom/school, charts/markers, refreshment, pay to external expert.
Stationery (purchased)
Refreshment: Rs: 500
External Expert: Rs: 2000
Writing reflective memos in their diaries and submit for feedback to Principal
Give feedback on these memos.
All teachers.



Principal
Every Friday



Monday
25 diaries/Ex-books
Diaries: Rs: 1000
















Goal 4: Increase management effectiveness
Objective
Action
Who will Do It?
By When
Resource
Estimated Cost
Delegate leadership responsibilities among 3 teachers on yearly rotational basis from August 2008 to July 2009
* 3 teachers assigned as section heads for:
                Pre-Primary
                Primary.
                Secondary.
* Appoint a new teacher.
Principal & Vice Principal
August 2008
Time Resources – Decrease work load (1 period each week) of section heads.

1 period each week.




Salary: Rs: 3000
Prepare a formal policy document for the school August 2008.
2 meetings of management and teachers to identify and formulate clear rules and regulations for school. (Policy guide lines for students and staff).
Management, Principal, Vice Principal and Teacher representative
July - August 2008
Samples/Specimens, Human Resource, stationery for documentation,
Refreshment.
Stationery & Refreshment: Rs: 500

Print a formal document for reference.
Management, Principal
September 2008
Printing Cost.
Printing (5 copies): Rs: 500













Goal 5: Improve existing facilities in the school
Objective
Action
Who will Do It?
By When
Resource
Estimated Cost
Establish library for students to provide reading facilities by September 2008.
Purchase furniture
* One table
* 6-8 chairs
* Three wall shelves.
* Floor seating:
       Carpet (10’x 12’)
       Cushions (8 – 10)
Management, Principal, Accountant
July, 2008
Finance, Transportation outsource, Labor Charges (Carpenter) and staff support
Wood, Cushions, Carpet.,
Table: Rs: 500
Chairs: Rs: 2000
Wood: Rs: 3000
Carpenter: Rs: 1000
Transportation: Rs: 300
Carpet: Rs: 5000
Cushions: Rs: 1000
Support Staff time:

Prepare a list of existing books in the school.
Ms. Amb
August,  2008
Time, 1 Staff member.
2 Hrs.
Assign 2 teachers for cataloging and setting up.
2 teachers.
August, 2008
2 teachers + 1 support staff, Time
4 Hrs (one school day)
2 Staff members.
Assign library periods in the class timetable of students from KG – X.
Vice Principal
September 2008
1 period per week, one teacher  to be assigned
All class teachers – 1 period each.
Provide a room for indoor games to compensate for outdoor physical education activities by August 2008.
Make a partition in Library room.
Principal
(Out sourcing carpenter)
August – September 2008
Labor Charges, Time
Ply boards: Rs: 1000
Laboring:  Rs: 300
Support Staff.
Purchase:
Table Tennis (01)
Carom Board (02)
Ludo + Chess games (04)
Management, Principal, Vice Principal, Accountant
September – October 2008
Finance, time, Labor, out-sourced transport, support staff.
Table: Rs: 6000 - 8000
Rackets & Balls.  Rs: 350
Carom Board: Rs: 500
Ludo & Chess: Rs: 300

Up grade computer lab by adding two new computers and repairing existing ones by August 2008.
Acquire quotations for PIV computers and purchase 2 computers.
Management Principal + Computer Instructor
July, 2008
Telephone calls, letters, finance
Telephone, Letters: 100
Computers: Rs: 30000
Transportation: 300
Discard/Repair out-of-order computers.
Vice Principal, Computer Instructor
July, 2008
computer expert (out sourced), service charges
Maintenance: Rs: 1000
Purchase posters related to Computers.
Computer Instructor
August, 2008
Finance.
Posters: Rs: 200









MONTH-WISE ACTIVITY PLAN FOR THE ACADEMIC YEAR 2008 – 2009

ACTIVITIES
JUL 08
AUG
08
SEP.
08
OCT
08
NOV
08
DEC
08
JAN
09
FEB
09
MAR
09
APR
09
MAY
09
JUN
09
Workshops.


Incorporate one activity for students’ critical thinking or inquiry in each lesson plan.



One research based home work in one subject in every month.

ENG
MATH
SCI, S.ST
URD,ISL

ENG
MATH
SCI, S.ST



Classroom observations with feedback

P-1
P-1
P-2
P-2

P-3
P-3
P-4
P-4


Form drama club, literary club, science club.
Assign one student and one teacher in-charge.












Drama club activity











Science club activity












Literary club activity











One day kingdom











Sports week













Hire a tae-Kwando teacher












Tae-Kwando classes for 1-5(girls and boys),
vi-x (boys only)



Quarterly in-school workshops for all teachers on1st Saturday:
*Lesson planning









(1st week)
(1st week

 Activity based teaching





 (1st week)







Teacher motivation








(1st week




Reflective practice

(1st week










Writing reflective memos in their diaries and submit for feedback to principal
Give feedback on these memos

Every Friday
Every Friday
Every Friday
Every Friday

Every Friday
Every Friday
Every Friday
Every Friday
Every Friday

*3 teachers assigned as section heads for:
Pre-primary
Primary, secondary
*appoint a new teacher.              




















Management and teachers to identify and formulate clear rules and regulations for
school(policy guide-lines for students and staff)












Print a formal document for reference












Prepared a list of all available books












Assign a teacher for cataloging.











Purchasing furniture
*one table
*6 to 8 chairs
*three wall shelves
*Floor seating
    Carpet
     Cushions











Assign library periods in the class time table of students from KG-X













Make a partition in library  room











Arrange :
Table tennis(1)
Carom board(2)
Laddo games (4)
Floor seating for laddo games.










Acquire quotations for PIV computers











Discard/repair out of order computers












Purchase posters related to computers













MONITORING PLAN


MONITORING PLAN OF ACTION PLAN FOR THE ACADEMIC YEAR 2008-2009

ACTIVITIES
WHAT TO MONITOR
HOW TO MONITOR
WHO WILL MONITOR
Teachers’ Professional Development
In School workshops
Plans (share) - Inform the concern persons and check resources
Verbal communication / meetings
Principal/ V.principal
Reflections/Ref. Journals
Regular submission of diaries
Checking and feed back
Principal
Lesson Planning
Lesson planning files
Checking and feedback
Vice principal/section heads

Students:
Taekwondo Classes
Regularity of classes

Physical checking
Principal/Vice Principal
Male staff
Sports Week.
Planning of events
Equipment
Written plans
Sports instructor
Sports committee
Clubs in class 9th
Allocation of periods & classes

Verbal communication /meetings
Principal, Vice Principal, Ms. Shehnaz, Club Heads
One day kingdom
Plans and its implementation allocated duties and resources



Review all policies

Principal & Vice Principal
Competitions + Activities.

Purchasing system



Ambereen/ sir Ubaid
Sir kamal
Principal/v.principal

Research Based Homework

Appointing a librarian
Principal, Madam Atia
Sir kamal
Language Development.



Management/Infrastructure
Policy Document
Reviewing market prices and models
Planning activities
Principal, Madam Atia, Mr. Kamal.
Computers and Networking.
Existing books - list of new books to purchase


Library/recreational hall.







COMMUNITY
Collaboration with other institutions






AUDIT QUALITY

 

                               
Yes /No
Are objectives/actions aligned with the vision/values of the school?
YES
Will completing the actions produce the intended outcome?                    
YES
Does implementation of the plan require any change in the management structure?
YES
Are the resources required for actions in place?
YES
Can progress be measured?                                                                                              
YES
Is the action plan likely to improve students’ learning?                              
YES
Will this plan be shared with all stakeholders?              
YES
                               




Individual reflections








[1] Pseudonyms have been used.

No comments:

Post a Comment

THE KNEE JOINT PAIN IN GILGIT-BALTISTAN - AN URGENT CALL TO ACTION

  THE KNEE JOINT PAIN IN GILGIT-BALTISTAN - AN URGENT CALL TO ACTION Darvesh Karim   Attending a recent social gathering in Gilgit-Bal...